Quiet New Modern Studio near Main Train Station - FRITZ-TOWER
Lehrter Straße, 10557, Berlin
23 m2, Floor: 61 Room100 Mbps2 People
About this listing
Entire apartment
The brand new luxury micro-apartment near Hauptbahnhof (central station) features concierge service in the lobby, a modern in-house gym, and a communal terrace on the 8th floor. The fully-furnished studio (23m² / 248 square feet) is designed and fitted out to a high standard: timeless kitchenette with stovetop, fridge, dishwasher, built-in microwave, water kettle, coffee machine, iron & board, modern bathroom with a walk-in shower. Perfect for business travelers or people relocating to Berlin. ...
Read moreAdditional Information
Cleaning service available upon request.
Services
Landlord's confirmation of residence (Wohnungsgeberbestätigung)Change of letterbox and doorbell labels possible
Broadcasting fee
Included in the rent
Cleaning
Available at extra charge
Parking
On the street nearby
Concierge
Included in the rent
Fitness
Included in the rent
Amenities
Essentials
- Washing machineIn the building
- DryerIn the building
- Coffee machine
- TV
- Desk or workspace
- WiFi
- Lift
Kitchen
- Dishwasher
- Kettle
- Stove
- Refrigerator
- Microwave
- Toaster
- Cutlery
- Freezer
Bedroom
- Bed linens
- Pillow
- Blankets
- Bedside lamp
- Closet or chest of drawers
Bathroom
- Shower
- Hairdryer
- Towels
Other
- Iron
- Ironing board
- Vacuum cleaner
- Broom
- Floor mop
- Smoke detector
- Wheelchair accessible
- Community lounge
- Outdoor area
Beds
1 Sofa bed
Bedroom
Availability
Minimum stay
3 Months
Available from
01.03.2027
- Mar 2026
- Apr 2026
- May 2026
- Jun 2026
- Jul 2026
- Aug 2026
- Sep 2026
- Oct 2026
- Nov 2026
- Dec 2026
- Jan 2027
- Feb 2027
2026/2027
House rules
Pets are not allowed
Smoking is not allowed
Cost overview
Monthly rent
€950
Security deposit
€2,000
Final cleaning fee
€150
€299 incl. VAT
Certifications and regulations
Energy certificate
- Energy efficiency class: A+
- Type of energy certificate: Consumption certificate
- Date of issue: After April 2014 (EnEV 2014)
- Main source of energy: Combined heat and power bio energy
- Type of heating: Central heating
- Year of construction: 2020
