Beautifully designed and modern penthouse with beautiful roof terrace
About this listing
Entire apartment
The specially designed new building has been structured and furnished in such a way that all tenants feel at home from day one. Whether short-term guest, people looking for a new challenge in Munich or students, we provide the all-round carefree package for the highest living standards. The solid brick construction, the specially developed energy concept, the increased sound insulation, the high-quality built-in furniture by carpenters, professional kitchens with granite worktops and the buildin...
Read moreAdditional Information
Ramersdorf Perlach is the largest district in Munich. South of the Marienplatz ideally situated close to the city centre, as well as to the airport or the mountains. Airport 30 minutes Central station 13 minutes Allianz Arena 14 minutes Oktoberfest 12 minutes Shopping centre 6 minutes Fairground 10 minutes Marienplatz 10 minutes Tegernsee 40 minutes next ski lift approx. 45 minutes Nearest subway 600 m Bus stop 50 m
Services
Amenities
Essentials
- Washing machineIn the building
- DryerIn the building
- Coffee machine
- TV
- Desk or workspace
- WiFi
- Terrace
- Door intercom system
- Lift
Kitchen
- Dishwasher
- Kettle
- Stove
- Refrigerator
- Oven
- Cutlery
- Freezer
Bedroom
- Bed linens
- Pillow
- Blankets
- Bedside lamp
- Closet or chest of drawers
Bathroom
- Shower
- Towels
Other
- Smoke detector
- Floor heating
- Wheelchair accessible
- Community lounge
Beds
1 Double bed
Bedroom
1 Sofa bed
Living room
Availability
When would you like to move in?
This listing represents 2 structurally identical apartments
House rules
Pets are allowed with conditions
Additional cleaning fee 150€
Smoking is allowed with conditions
only on balcony or terace.
Cost overview
Monthly rent
€2,890
Security deposit
€1,000
Final cleaning fee
€160
€249 incl. VAT
Certifications and regulations
Energy certificate
- Energy efficiency class: A+
- Type of energy certificate: Consumption certificate
- Date of issue: After April 2014 (EnEV 2014)
- Main source of energy: Gas
- Type of heating: Combined heat and power plant
- Year of construction: 2019