Exceptional apartment in Alt-Moabit
Paulstraße, 10557, Berlin
51 m2, Floor: 22 Rooms1 Bed2 People
About this listing
Entire apartment
This light-filled apartment is located near the government district, right next to Carl-von-Ossietzky Park. It's just a 5-minute walk to the Spree River. Enjoy the idyllic riverside promenade while jogging, cycling, or sipping a cup of coffee. The Bellevue S-Bahn station is 600 meters away. Bus and tram stops are only 150 meters away. The main train station is only 2 stops away. The Spreebogen Arenal is very close by and there are doctors, kindergartens, and various schools in the immediate vi...
Read moreServices
Landlord's confirmation of residence (Wohnungsgeberbestätigung)Change of letterbox and doorbell labels possible
Broadcasting fee
Not included in the rent
Cleaning
Not available
Parking
On the property, not included in the rent
Concierge
Not available
Fitness
Not available
Amenities
Essentials
- Washing machineIn the apartment
- DryerIn the apartment
- Coffee machine
- Desk or workspace
- WiFi
- Door intercom system
- Lift
Kitchen
- Dishwasher
- Kettle
- Stove
- Refrigerator
- Oven
- Microwave
- Toaster
- Cutlery
- Freezer
Bedroom
- Bed linens
- Pillow
- Blankets
- Bedside lamp
- Closet or chest of drawers
Bathroom
- Bathtub
- Hairdryer
- Towels
Other
- Vacuum cleaner
- Broom
- Floor mop
- Smoke detector
- Wheelchair accessible
Beds
1 Double bed
Bedroom
Availability
Minimum stay
3 Months
Maximum stay
9 Months
Available from
15.12.2025
- Dec 2025
- Jan 2026
- Feb 2026
- Mar 2026
- Apr 2026
- May 2026
- Jun 2026
- Jul 2026
- Aug 2026
- Sep 2026
- Oct 2026
- Nov 2026
2025/2026
House rules
Gemäß Hausordnung. Ruhezeiten an Werktagen 22 bis 6 Uhr an Sonntagen 22 bis 8 UhrPets are not allowed
Smoking is not allowed
Cost overview
Monthly rent
€1,490
Security deposit
€2,200
Final cleaning fee
€150
€299 incl. VAT
Certifications and regulations
Energy certificate
- Energy efficiency class: B
- Type of energy certificate: Assessed by engineer (Bedarfsausweis)
- Date of issue: After April 2014 (EnEV 2014)
- Main source of energy: District heating
- Type of heating: District heating
- Year of construction: 1996
- Energy consumption parameter: 59.6 kWh/(m²*a)
