Previous
Next
Floor Plan
Landlord Verified

Cozy and newly renovated 1.5 room apartment

Mitterfeldring, 85586, Poing
43 m2, Floor: 12 Rooms1 Bed2 People

About this listing

Entire apartment

Bathroom: The modern bathroom impresses with the walk-in shower and underfloor heating. Towels are provided. Kitchen: New kitchen with kettle, coffee maker, dishwasher, stove and oven, refrigerator and freezer. There is sufficient cutlery and crockery. Bedroom: The cozy, narrow bedroom has a 1.60 wide bed, which can also accommodate two people. Bed linen is available Hallway: In the hallway, the washing machine is hidden in a built-in closet, where you can also find brooms, vacuum cleaner an...

Read more

Services

Landlord's confirmation of residence (Wohnungsgeberbestätigung)Change of letterbox and doorbell labels possible
Broadcasting fee
Not included in the rent
Cleaning
Not available
Parking
Concierge
Not available
Fitness
Not available

Amenities

Essentials

  • Washing machineIn the apartment
  • Coffee machine
  • TV
  • WiFi
  • Balcony
  • Door intercom system

Kitchen

  • Dishwasher
  • Kettle
  • Stove
  • Refrigerator
  • Oven
  • Cutlery
  • Freezer

Bedroom

  • Bed linens
  • Pillow
  • Blankets
  • Closet or chest of drawers

Bathroom

  • Shower
  • Hairdryer
  • Towels

Other

  • Iron
  • Ironing board
  • Vacuum cleaner
  • Broom
  • Floor mop

Beds

1 Double bed

Bedroom

Availability

Minimum stay
3 Months
Maximum stay
6 Months
Available from
31.05.2026
  1. Dec 2025
  2. Jan 2026
  3. Feb 2026
  4. Mar 2026
  5. Apr 2026
  6. May 2026
  7. Jun 2026
  8. Jul 2026
  9. Aug 2026
  10. Sep 2026
  11. Oct 2026
  12. Nov 2026
2025/2026

House rules

Pets are not allowed

Smoking is not allowed

Cost overview

Monthly rent

€1,300

Charges included in the rent

Furniture surcharge

Operating costs

Heating

Electricity

Internet

Security deposit

€1,800

Final cleaning fee

€150

€299 incl. VAT

Certifications and regulations

Energy certificate

  • Type of energy certificate: Consumption certificate
  • Date of issue: Before April 2014 (EnEV 2009)
  • Main source of energy: District heating
  • Type of heating: District heating
  • Year of construction: 1995
  • Energy consumption for hot water included: Yes